| Code | Description |
|---|---|
| LO1 | Adopts passive design principles in environmental systems design, makes appropriate design decisions accordingly, and communicates these decisions using suitable representation techniques. |
| LO2 | Makes informed decisions regarding the integration of active systems into the building and implements the necessary design adjustments. |
| LO3 | Defines the relationship between daylighting and artificial lighting and applies this relationship effectively within the design. |
| LO4 | Demonstrates an understanding of the fundamental principles of acoustics and room acoustics in environmental systems design, and applies this knowledge to the design process. |
| Week | Content |
|---|---|
| 1 | Introduction |
| 2 | Passive air conditioning and passive design principles in buildings |
| 3 | Heating systems and heating load, HVAC System Components, passive and active fire control systems |
| 4 | Natural and artificial lighting design |
| 5 | Designing water supply to the building, water supply and water tank, plumbing systems, Plumbing, wet areas and waste water removal systems |
| 6 | Environmental noise control and architectural acoustics |
| 7 | Environmental noise control and architectural acoustics |
| 8 | MIDTERM |
| 9 | Studio Work-Control of distances between buildings, calculation of shadow cones, site plan, building envelope design based on thermal comfort, U value calculation, design of building envelope layers |
| 10 | Studio Work-Control of distances between buildings, calculation of shadow cones, site plan, building envelope design based on thermal comfort, U value calculation, design of building envelope layers |
| 11 | Studio work: Selection of the HVAC system for the building, calculation of the heating load, planning of the fire control systems |
| 12 | Studio Work-Lighting space design in the building envelope, transparency ratio, solar control, electrical project preparation |
| 13 | Studio work: Water supply to the building, design of the cold and hot water system in the plan, sewage discharge from the building, Preparation of architectural drawings for a typical wet area (plan and section 1/20) |
| 14 | Studio Work-Calculation of environmental noise, sound insulation in the building envelope, acoustic design of indoor halls, reflection controls, material decisions |
| 15 | Studio Work-Calculation of environmental noise, sound insulation in the building envelope, acoustic design of indoor halls, reflection controls, material decisions |
| Activity | Count | Duration (Hours) | Total |
|---|---|---|---|
| Attendance | 8 | 5.00 | 40.00 |
| Practice | 7 | 5.00 | 35.00 |
| Post-Prectice Individual Study | 7 | 5.00 | 35.00 |
| Midterm Exam/Preparation | 1 | 30.00 | 30.00 |
| Final Exam/Preparation | 1 | 30.00 | 30.00 |
| Total Workload (Hours) | 170 | ||
| ECTS Credit (Workload / 25) | 6 | ||
| # | Assessment Type | Contribution (%) |
|---|---|---|
| 1 | Midterm Exam | %25 |
| 2 | Workshop | %35 |
| 3 | Final Exam | %40 |
| TOTAL | %100 | |
| PO \ LO |
LO1
|
LO2
|
LO3
|
LO4
|
|---|---|---|---|---|
| PO-1 | ||||
| PO-2 | ||||
| PO-3 | ||||
| PO-4 | ||||
| PO-5 | ||||
| PO-6 | ||||
| PO-7 | ||||
| PO-8 | ||||
| PO-9 | ||||
| PO-10 | ||||
| PO-11 | ||||
| PO-12 | ||||
| PO-13 | ||||
| PO-14 | ||||
| PO-15 | ||||
| PO-16 | ||||
| PO-17 |
| # | Method Name | Description | Tools |
|---|---|---|---|
| 1 | Lecture (expository teaching), interactive discussion | Listening and taking notes. | Standard classroom technologies, multimedia tools (projector, computer, digital presentations) |
| 2 | Problem Solving | * Analyzing physical and physiological problems using problem-solving techniques and developing appropriate solutions. | |
| 3 | Laboratory | Listening, note-taking, conceptual analysis, critical thinking, questioning, and participation in discussions. | Special equipment |
| 4 | Homework | Solving and analyzing homework questions using a computer and Excel. | Computer |